Introduction

The Falkland Islands aim to have a transparent and accountable process for approving environmental documents. Environmental Impact Statements (EIS) are subject to a 42 day public consultation process and must be made publicly available throughout this and once the final document has been approved. In 2016 a guidance document was produced by FIG with input from industry and consultees. This document is available below.

Files:
Date 2015-10-19
File Size 167.82 KB
Download 730

The Falkland Islands Government (FIG) and companies operating in the Falklands agreed at the Environmental Forum in 2015 that Waste Management Plans should also be made publicly available. This encourages greater understanding of operations and processes surrounding waste disposal from exploration drilling.

EIS Documents

Date 2015-05-14
File Size 21.91 MB
Download 639

Date 2015-01-20
File Size 92.6 MB
Download 650

Premier Oil EIA submission for 2015 exploration drilling campaign.

Date 2015-01-20
File Size 15.52 MB
Download 822

Waste Management Plans (WMP)

Date 2015-10-19
File Size 671.22 KB
Download 578

Date 2015-11-09
File Size 636.91 KB
Download 472

Hitorical EIS Documents

The following documents were approved under previous legislation. They are now obsolete and do not represent legally compliant Environment Impact Statements under the current legislative regime.

Date 2016-08-10
File Size 41.58 MB
Download 196

Date 2016-08-10
File Size 5.17 MB
Download 322

Date 2016-08-10
File Size 22.51 MB
Download 287

Date 2018-05-02
File Size 13.89 MB
Download 25

BHP EIS2009
Date 2016-08-10
File Size 23.78 MB
Download 720

Date 2018-05-03
File Size 23.02 MB
Download 24

Date 2018-05-03
File Size 4.68 MB
Download 25

Date 2016-08-10
File Size 26.89 MB
Download 265

Date 2016-08-10
File Size 11.98 MB
Download 366

Date 2018-05-03
File Size 27.91 MB
Download 19

Date 2018-05-03
File Size 28.15 MB
Download 26

Date 2018-05-03
File Size 11.17 MB
Download 26

Date 2016-08-10
File Size 487.66 KB
Download 260